Glowing Reviews from our Clients
CRL is proud of the work it carries out for a wide range of private and public sector clients. Here's what a few of them have had to say!
"The contract scope and programme changed during the course of the works, CRL were able to adapt quickly to the change and helped complete the works within the programme. The emergency bridge deck repair works were executed quickly and safely which was quite impressive given the scope and timescale restraints."
Richard Skyrme| Contracts Manager | Centregreat Limited
M4 J37 to J38 Bridge Refurbishment
"Would just like to say that the team who conducted the works at the Hilton London metropole were amazing! The project was handled in a swift and timely manner by Patrick and his crew.
We would always welcome Patrick back as he was a pleasure to work with, a great communicator and the all-round politeness within the team was fantastic!"
Adam Little | Assistant Chief Engineer | Hilton London Metropole
Lonond Hilton Metropole
"The overall installation process, from pre-contract through to completion was first class.
Communication throughout the project was excellent, and of particular note was how well the the installation and overall project was managed by the CRL Site Foreman.
I would highly recommend CRL and would definitely use them on any future projects."
Adam Hurlin | Construction Manager | Paramount Office Interiors Limited
Hodge House, Cardiff
"Please can you pass on my thanks to your team that did the repairs at Shaftesbury. I have been to site a few times and the lads on site have been more than helpful. The site was kept clean and tidy throughout the works and the workmanship has also been to a high standard. You can see that they all have pride in their work!
At no point throughout this project has there been a problem with regards to yourselves and yesterday was a proven point when I asked Pip if he could make sure that the scaffolding was clean from any over sprayed concrete, also with the help and advice that you have given to me and Simon regarding phase 2.
I am looking forward to working with yourselves again in the future."
Kevin Davis | Site Agent (Structures) Highways Dorset Council
Shaftesbury Overbridge
“You listened and addressed the issues, bringing in the specialists to move the project forward with on-site inspections to determine the best way forward with sign-off by the structural engineer. The building was handed back in advance of the deadline and budget, allowing for immediate occupation for incoming students yesterday.”
Nicholas Bryant | Estate Surveyor | FM Hard Services
University of Bristol (Campus Division)
“Roger Southwell of CRL immediately struck me as the ultimate professional from our first meeting. He clearly explained what could be done, and how it would be done, in a manner that I could understand, and gave me total assurance that CRL’s attitude is one of doing everything right and to the customer's satisfaction.”
Tim Bailey | Company Secretary | Park Row Management LTD
Irving House & Terry House (Bristol)
“Pip Spencer of CRL was an absolute star, and I really couldn’t have wished to have had anyone better running things on site. He was always available to discuss the work, always quick to communicate what was being done each day so that preparations could be made for the following days work, had a tremendous eye for detail and kept things moving so that there was no down-time.”
Tim Bailey | Company Secretary | Park Row Management LTD
Irving House & Terry House (Bristol)
“All,I just wanted to drop you a quick note to say thanks and very well done in delivering the works at Helsby in such good time. We knew we wanted to take advantage of the reduced traffic levels recently, and you have pulled together to deliver the scheme in record time – well done! I visited the site recently and was really pleased to see the quality of the work being done, and the measures put in place to deliver the work safely, including of course all the necessary social distancing arrangements.Thanks very much, and well done again.”
Alan Shepherd | Divisional Director
Highways England
M56 Helsby
“Just a quick note to thank the team for a successful project carrying out the concrete repairs to our Unit 2 and 3 sub-basements. The works were completed to a high standard with a good safely record in one of the station’s most difficult environments. A special note to Mark for his management of the on-site works. He has successfully led teams on site for a number of difficult projects now, requiring working under permit restrictions, co-ordinating with other working parties and close man-management in sometimes high-risk environments. Mark and his team have built and maintained a reputation as one of our most trusted teams on site and we look forward to working with them in the future.”
Nick Smith | Civil Engineer | Drax Power Station
Unit 2 & 3 Sub-basement
“The NEC3 contract is founded upon all the parties acting “in a spirit of mutual trust and co-operation”. CRL and ourselves (BOP) exemplified this throughout the project. Flexibility on both sides, open communication and a joint ambition to do a great job, ensured success.
And it really has been a success.”
Beth Barker-Stock | Highway Design Team Leader
Borough of Poole
Dolphin MSCP Poole
“Please can you pass my special thanks to Greg and your team for the excellent job which was carried out on the on the project? I sincerely appreciate all the hard work demonstrated. Overall, I was really impressed with how Greg handled the situations & did his upmost to push the scheme forward. I believe that we achieved an excellent client/contractor relationship on site & Greg was very accommodating with my requests for extra repair work and continuous access to the works areas. Most importantly I was impressed with his "can-do" attitude and I look forward to working with CRL in the future.”
Paul Wiles | Site Supervisor | Highways England
“I would like to express my thanks and appreciation for the efforts put in throughout the works to successfully deliver the scheme. It is also noted that the challenge was met without having any detrimental impact on the quality of work delivered or on the health and safety of the workforce and road users.”
Andy Butterfield | Head of Service Delivery | Highways England
M5 Western Arm
“Just a message of thanks for the successful delivery of the Area 9 Capital works programme. The delivery of the outputs identified at the start of the year was not only achieved but also exceeded in several instances. The determination, dedication and flexibility of you and your teams to make this possible, against a challenging background, is acknowledged and much appreciated. It has been a real example of how Collaboration Overcomes Viral Impact and Delivers.”
Mike Holmes | Asset Delivery Manager | Kier Highways
Area 9 Capital Works Programme
“Just wanted to drop a quick note to say how impressed I was with the guys we had on site. Great PPE, great attitude to wearing the proper PPE for the task in hand, very well self-contained areas, kept clean, tidy and all-round very efficient with what they do. A clean tidy area is such an easy way of providing a great perception of the work contractors do and your operatives managed this very well.”
Paddy Murray | Project Manager | Farrans
BAE - Grouting of Pivot Brackets
“As you may be aware, we had a site visit yesterday from the Hampshire councillor for transport, and many of the senior team leaders from Hampshire and Skanska. The visit included a site walk around and a trip out on one of the pontoons. The visit went extremely well and we have received positive feedback on the attitudes, behaviours and knowledge of everyone on site. Please pass on our thanks to the site teams for ensuring the visit was a success.”
Jack Davis | Senior Site Agent | Skanska Infrastructure Services
Redbridge Causeway
“I have found working with Martyn Lewis extremely easy and straight-forward despite a number of potential issues that we have come up against during the contract - he has been willing to make suggestions to overcome any obstacles and has been proactive for the duration of the works to ensure that we deliver the project to the end-client. Similarly, Andy Barley on site has been very good in the way that matters have been programmed and handled and his constant liaison with the client site manager.”
Jon Bird | Contract Administrator| IQ Student Accommodation
Opal Villas Plymouth
“The nature of the contract meant that programming of the works was not straight-forward, CRL co-operated well with us (Murphy) to achieve the required results. Their operatives worked steadily in a well-planned fashion and achieved good outputs. They displayed good product knowledge and carried out mulitple tasks employing a large range of skills.”
James Roberts | Construction Manager| J Murphy & Sons
Cowlane Pumping Station